Close Menu
Indian Textile Journal
  • Home
  • Textile Machinery
    • Allied Equipment and Accessories
    • Automation
    • Dyeing, Processing & Finishing
    • Knitting
    • Printing
    • Spinning
    • Weaving
  • Tech Textiles
  • Sustainability
  • Resources
    • Trade Fair
    • Events
    • Videos
  • Interview & Opinion
  • Subscribe Now
  • Advertise
  • Digital
  • Apparels & Garments
  • Fibres & Raw Materials
  • Home Textiles
  • Industry Update
Facebook X (Twitter) YouTube LinkedIn
Indian Textile Journal
Epson
  • Home
  • Textile Machinery
    • Allied Equipment and Accessories
    • Automation
    • Dyeing, Processing & Finishing
    • Knitting
    • Printing
    • Spinning
    • Weaving
  • Tech Textiles
  • Sustainability
  • Resources
    • Trade Fair
    • Events
    • Videos
  • Interview & Opinion
  • Subscribe Now
  • Advertise
  • Digital
  • Apparels & Garments
  • Fibres & Raw Materials
  • Home Textiles
  • Industry Update
Indian Textile Journal
Home » Redesigning of Rieter’s Winterthur location
Industry Update

Redesigning of Rieter’s Winterthur location

By October 11, 20171 Min Read
Share Facebook Twitter LinkedIn WhatsApp Copy Link

Rieter intends to create a modern location in Winterthur, concentrating the customer center, product and technology development, assembly and administration on an area of approximately 30 000 square meters.

The official start-up for this project is planned for mid-November 2017. The study assignment has been awarded to the renowned consultancy firms RLC Architekten AG, BDE Architekten GmbH, Giuliani Hönger AG, fsp Architekten AG, and Stücheli Architekten AG from the Canton of Zurich, including two from the city of Winterthur. The consultancy firms have time until the end of March 2018 to submit their projects. These will then be evaluated by a panel of judges, made up of nine technical specialists and professional experts. The final decision on the realization of the project will be taken by the Rieter Board of Directors during 2018.

Parts of the Rieter site are located in an archaeological zone. Rieter wants to give the authorities sufficient time to carry out the necessary archaeological surveys and any possible rescue excavations. The early demolition of the building “Werkhalle 40”, Klosterstrasse 18, in the area of the former Töss Monastery, is necessary for this purpose. The demolition is expected to take place in 2018.

Previous ArticleHeiQ empowered tri-suit for athletes
Next Article Aleph showcasing LaForte®Paper at SGIA EXPO

Related Posts

Sonaselection India raises Rs 420.47 million from 3 anchor investors at Rs 99/share

September 17, 2026

Obituary: Dr. Chidambaram Bose – A visionary leader and pillar of TAI Mumbai Unit

September 15, 2026

Sonaselection India Limited IPO opens Sept 17 at Rs 94-99

September 10, 2026
Recent Posts
  • Style Baazar recently hosted a fashion show to unveil its festive collection
  • Myntra launches Italian brand Sisley in India
  • Jeanologia demonstrates how sustainability and profitability go hand in hand
  • Bureau of Indian Standards initiative enhances nationwide cotton fibre testing infrastructure
  • New Red-Ox-Free Discharge Printing Technology receives Indian patent
  • ALLIED Feather + Down adds audited carbon footprint data to its TrackMyDown platform
  • Sonaselection India raises Rs 420.47 million from 3 anchor investors at Rs 99/share
  • Santosh Katariya: Introducing MDR on UPI at the start of festive season is very challenging
Facebook X (Twitter) YouTube LinkedIn
  • About us
  • Contact us
  • Privacy Policy
  • Terms and Conditions

SISTER PUBLICATIONS

Construction World Equipment India Industrial Product Finder Infrastructure Today

© 2026 Indian Textile Journal. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.